POWER PLANT Project

References

  • 1. PT INDONESIA POWER

        Upgrading Generator Excitation Panel at Sub Unit UP Saguling

    • Scope of Work  : Supply, Install, and  Commissioning for 4 unit
    • Contract Value  : IDR 2.6 Billion
    • Year                  : 2014-2015
  • 2. PT INDONESIA POWER

        Coal Feeder Unit 1-3, UBP Suralaya

    • Scope of Work  : Supply, Install, and Commisioning Variable Speed
    • Drive (VSD) for Coal Feeder Unit 1-3.
    • Contract Value  : IDR 3.8 Billion
    • Year                  : 2013-2014

     

  • 3. PT INDONESIA POWER

         Conveyor BC 13-14 PLTU SURALAYA

    • Scope of Work  : Recovering Electrical System for Belt
    • Contract Value  : IDR 3 Billion
    • Year                  : 2012-2013
  • 4. PT INDONESIA POWER

         Relocating PLTG 3-4 Pesanggaran Bali

    • Scope of Work  : Electrical Installation and Testing for Gas
    • Contract Value  : IDR 3.3 Billion
    • Year                  : 2012-2013
  • 5. PT KARAKATAU DAYA LISTRIK

          Installing VSD Cooling Water Pump

    • Scope of Work  : Supply, Install, and  Commissioning for MV VSD
    • Contract Value  : IDR 4.6 Billion
    • Year                  : 2013-2014

     

  • 6. PT Dian Swastika Sentosa

         Developing Stockyard AND Barge Loading Conveyor System

    • Scope of Work  : Upgrading Complete Set of Medium Voltage VSD
    • for Feed Water Pump.
    • Contract Value  : USD 220.000,-
    • Year                  : 2011-2012

     

  • 7. PLTP Gunung Salak

        Modification of Cooling Water Pump System from

        Direct Online into VSD System

    • Scope of Work  : Supply, Install, and  Commissioning of VSD System
    • for 4 Unit, 1.2 MwW Motors Cooling Water Pump
    • Contract Value  : IDR 27 Billion
    • Year                  : 2008-2009

     

Follow Us :