PORT Project

References

  • 1. PT TERMINAL TELUK LAMONG ( PELINDO III)

        Developing Port Unloading Conveyor System

    • Scope of Work  : Engineering, Procurement, and Construction for
    • Electrical of Port Unloading Conveyor System
    • Contract Value  : IDR 26.3 Billion
    • Year                  : 2016
  • 2. PT KRAKATAU BANDAR SAMUDERA

        Developing Conveyor Line Port VI in TUKS Area

        PT Krakatau Steel (persero) Tbk.

    • Scope of Work  : Engineering, Procurement, and Construction for
    • Electrical of Conveyor Line Port VI
    • Contract Value  : IDR 19.6 Billion
    • Year                  : 2013-2014
  • 3. OTHERS

    Tortor, eget ornare urna. Duis varius tellus eros. Donec odio arcu, rutrum ac rutrum eget, bibendum ac enim. Phasellus hendrerit iaculis purus.

    1. Aliquam sit amet molestie odio.
    2. Sed commodo dictum consequat aenean in est.
    3. Donec odio arcu, rutrum.
    4. Aliquam sit amet molestie odio.
    5. Sed commodo dictum consequat aenean in est.
    6. Donec odio arcu, rutrum.

Follow Us :

• MDM - EPC © PT Multi Daya Mandiri • 2008 - 2017 •